Mound City Code 380.00
SECTION 380 – ESTABLISHMENT OF LAND USE FEES
380.05 Purpose. The purpose of this ordinance is to comply with Minnesota State Statutes, 426.353, Subd. 4, which states that a municipality may prescribe fees sufficient to defray the costs incurred by it in reviewing, investigating, and administering an application for an amendment to an official control established pursuant to sections 462.351 to 462.364 or an application for a permit or other approval required under an official control established pursuant to those sections. Fees as prescribed must be by ordinance.
380.10 Building and Construction Fees
300.20 Wrecking Permit
Minor building $50
Minor building to be replaced
on same site $50
Single family wood frame $150
Duplex $200
Multiple dwelling: 1st two units $200
Each add’l unit $250
Industrial, commercial, institutional:
Total cost of wrecking at $6 for each $500 or fraction
thereof of the market value of such work.
Gas burners:
Not exceeding 99,000 BTU $10
100,000 – 199,999 BTU $15
200,000 – 399,999 BTU $30
400,000 – 599,999 BTU $44
600,000 – 999,999 BTU $60
Install/remove flammable & combustible liquids and LP tanks
Tank not buried enclosed
500 gallons or less $10
Over 500 gallons $15
Tank buried or enclosed $25
Removal of combustiable/flammable
liquid tank $15
Removal of storage tanks of
above/below ground liquor gas $15
311.0 Heating, air conditioning & ventilation
Contract prices $20 min. or 1% of contract price,
whichever is greater
Gas piping $5 for up to 3 openings
$1 for each additional opening
315.20 Trailers
Occupancy permit $100
Mobile home set-up inspection fee $75
315.35 Appeal to applicant $50
320.00 Public Lands Permit – major
(value +$1000) $200
*fee applies only if public benefit is derived*
Contractor License Verification $5
300.22 Fees for building permits, fire suppression, inspection, and
plan check shall be set according to the 1997 UBC, Section 101, Table 1-A + surcharge as described below:
Total Valuation Fee
$1.00 to $500.00 $23.50
$501.00 to $2,000.00 $23.50 for the first $500.00 plus $3.05 for each additional
$100.00 or fraction thereof, to and including $2,000.00.
$2,001.00 to $25,000.00 $69.25 for the first $2,000.00 plus $14.00 for each additional
$1,000.00 or fraction thereof, to and including $25,000.00.
$25,001.00 to $50,000.00 $391.25 for the first $25,000.00 plus $10.10 for each additional
$1,000.00 or fraction thereof, to and including $50,000.00.
$50,001.00 to $100,000.00 $643.75 for the first $50,000.00 plus $7.00 for each additional
$1,000.00 or fraction thereof, to and including $100,000.00.
$100,001.00 to $500,000.00 $993.75 for the first $100,000.00 plus $5.60 for each additional
$1,000.00 or fraction thereof.
$500,001.00 to $1,000,000.00 $3,233.75 for the first $500,000.00 plus $4.75 for each additional
$1,000.00 or fraction thereof, to and including $1,000,000.00.
$1,000,001.00 and up $5,608.75 for the first $1,000,000.00 plus $3.65 for each additional $1,000.00 or fraction thereof.
OTHER INSPECTIONS AND FEES:
1. Inspections outside of normal business hours minimum two hour charge - $47.00 per hour.
2. Re-inspection fee - $47.00 each
3. Inspections for which no fee is specifically indicated minimum one half hour charge - $47.00 per hour
4. Additional plan review required by changes, additions, or revisions to approved plans – minimum one half hour charge - $47.00 per hour
5. For use of outside consultants for plan checking and inspections or both – Actual cost.
Investigation Fee Actual cost
Permit renewal fee Cost of 5% of
original building
permit
380.15 Plumbing Permits:
310.00 Permit Fee for major improvement ($500+) $25
Per fixture fee for major improvement $10
Per rough-in only $10
16B665 Permit Fee for minor improvement <$300 $15
Permit Fee for minor improvement
$300-$500 5% of improvement cost
(Minor Impr. must be done by owner or (excluding fixture costs)
licensed contractor)
Per 100 feet of pipe or fraction thereof $8
Per 100 feet of repair or fraction $5
Outside sewer and/or water inspection $25
Private water well inspection $25
310.40 Additional inspections $10
Commercial Plan Review – Plumbing Permits
Water distribution and (i) 25 or fewer drainage fixture units, $150.00
drain, waste, and vent (ii) 26 to 50 drainage fixture units, $250.00
systems, including, (iii) 51 to 150 drainage fixture units, $350.00
interceptors, separators, (iv) 151 to 249 drainage fixture units, $500.00
or catch basins (v) 250 or more drainage fixture units, $3.00 per drainage fixture unit to a maximum of $4,000 .00
vi) $70.00 per interceptor, separator or catch basin
Building sewer service only $150.00
Building water service only $150.00
Building water distribution $5.00 per supply fixture unit or $150.00,
only, no drainage system whichever is greater
Storm drainage system A minimum fee of $150.00 or
(i)$50.00 per drain opening, up to a maximum of $500.00 an
(ii)$70.00 per interceptor, separator, or catch basin
Manufactured home park or 1 to 25 sites, $300.00
campground 26 to 50 sites, $350.00
51 to 125 sites, $400.00
more than 125 sites, $500.00
Revision to previously Review of plans for which commissioner has issued
reviewed or incomplete plans two or more requests for additional information, per review
$100 or ten (10) percent of the original fee, whichever is greater.
Proposer-requested revision (i) with no increase in project scope, $50.00 or ten percent of the original fee, whichever is greater; and
(ii) with an increase in project scope, $50 plus the difference between the original project fee and the revised project fee
380.20 Wells:
305.00 Wells – per drilling or deepening $65
380.25 Building Relocation:
Moving permit fee: not on State or County Highway:
(requires Conditional Use) $350
Moving permit fee: On State or County Highways:
No fee, but required evidence of insurance and refundable $250 cash.
380.30 Excavation & Land Reclamation
460.15 Grading plan review fees
*50 cu. yards or less $0
*51-100 cu. yards $15
*101-1,000 cu. yards $22
*1,001-10,000 cu. yards $30
*10,001-100,000 cu yards
First 10,000 cu. yards $30
Additional for ea 10,000 cu. yards
or fraction thereof $15
*100,001-200,000 cu. yards
First 100,000 cu. yards $165
Additional for ea 10,000 cu. yards
or fraction thereof $9
*200,001 or more
First 200,000 cu. yards $255
Additional for ea 10,00 cu. yards
or fraction thereof $4.50
Additional plan review, due to changes,
additions, or revisions to approve
plans: Per Hour (Min. ½ hour) $30
GRADING PERMIT FEES:
*50 cu. yards or less $15
*51-100 cu. yards $22
*101-1,000 cu. yards
First 1,000 cu. yards $22.50
Additional for ea. 100 cu. yds.
or fraction thereof: $10.50
*1,001-10,000 cu. yards
First 1,000 cu. yards $117
Additional for ea. 100 cu. yds.
or fraction thereof: $9
*10,001-100,000 cu. yards
First 1,000 cu. yards $198
Additional for ea. 100 cu. yds.
or fraction thereof: $40.50
*101,000 cu. yards or more $562.50
Additional for ea. 100 cu. yds.
or fraction thereof: $22.50
After hours inspection:Minimum charge (2 hrs) . $30/hr.
Re-inspection fees assessed under Provision
of chapter 305 (g) (UBC) $30/hr.
Inspection for which no fee is specified: (Minimum chg. ½ hr.)
Fee for authorizing additional grading under valid permit: Difference
between original and entire project.
380.35 Land Use Administration Fees (staff reports, meetings, etc.)
Property File Research Admin. Fee (non-owners) $15.00
Zoning Letter $25.00
Building Permit Deposit (to cover staff review time/non-pickup)
Minor Projects (Value less than $1,000) $100.00
Major Projects (Value more than $1,000) $500.00
Land Use Application Fee – City Staff
1 to 3 hours No Charge
More than 3 hours $60.00/hr.
Unauthorized Construction/No Permit Issued Double Bldg Permit Fee
330.10 Waiver of Platting Fee $200
Waiver of Platting Escrow $500
Subdivison Exemption Application Fee $200
Subdivision Exemption Escrow $500
330.10 Dock Parcel Subd. Application Fee $200
Dock Parcel Subd. Escrow $500
Boundary Adjustment Application Fee $100
Boundary Adjustment Escrow $500
330.10 Membrane Structure Permit $50
350.475 Fence Permit $55
350.530 Zoning Variance $200
Variance escrow $500
350.525 Conditional Use Permit $350
CUP escrow $500
350.755 Vacation $350
Stormwater Permit $300
Stormwater escrow $500
Floodplain Alteration Permit $300
Floodplain Alteration escrow $500
350.1100 Wetlands Permit $350
350.520 Zoning Amendment $350
Rezoning escrow $500
Planned Unit Development $1,700
Site Plan Review $350
Commercial Site Plan Review Escrow $500
Preliminary Plat $350+$15/lot
Final Plat $350+$15/lot
Minor Subdivision: Lot split $250
Per lot over 2 lots $15
330.120 Park Dedication Fee – minor $1,100/lot
Park Dedication Fee – major $1,100/lot or
10% of land
market value,
whichever is
greater
Escrow deposit – small proj. app. $1,000
Escrow deposit – large proj. app. $5,000
350.1400 Adult Establishment License Fee $2,000
Police Dept. background check $65/hr.
365.05 Sign Permit: $100
Sign alteration fee: Structural
alteration, up to the 1st $1,000 $50
375.00 Erosion Control Construction Escrow $500
Erosion Control Site Inspection Fee $70
(per inspection)
Temporary Sign Permit $25
492.00 Containers in Right-of-Way $50
493.00 Portable Storage Container $50
(ORD 13-2003, 12/7/03) (ORD. 04-2004, 7/04/04)(ORD. 11-2004, 10/31/04) (ORD. 12-2004, 12/26/04)